Pressure and Leak Testing

Tools, Assembly and Test Equipment

Pressure and leak testing is the step between finished installation and filling. The test shows whether every joint in the cooling circuit withstands the later operating pressure before liquid stands above live equipment. Two methods are common: the hydraulic pressure test with water, which holds the circuit at test pressure and evaluates the pressure drop over a defined holding time, and the pneumatic pre-test with air or nitrogen, which finds coarse leaks without wetting the room. Both results belong in the handover record together with test pressure, duration and temperature.

No assortment is currently listed in this category. It describes the function within the cooling circuit while the range is being built up. Test pumps, gauges and isolating valves for the test rig are not yet stocked. Locating the leak itself is covered by the neighbouring category for leak detection fluids and test sprays, while controlled tightening of the joints beforehand belongs to torque and assembly tools.

⚡ No assortment listed - the category describes the test step while the range is built up
↕ Test before filling - a leak in service hits the electronics, not just the circuit
⚙ Pressure drop over holding time - a single glance at the gauge is not a test
◆ Log the temperature - cooling during the holding time lowers pressure without any leak
⚠ Pneumatic pre-test - find coarse leaks before water reaches the room
✓ Document the result - test pressure, duration and temperature belong in the handover record

Hydraulic pressure test and pneumatic pre-test side by side

CriterionHydraulic pressure testPneumatic pre-test
Test mediumwater or water-glycolair or nitrogen
Detectseven fine leaks as droplets at the jointlarger leaks and open connections
Stored energylow, the medium is barely compressiblehigh, isolation and clearance are required
Consequence of a leakmoisture in the room, drying and cleaning neededno moisture, indication by sound or foam
Evaluationpressure drop over the defined holding timepressure drop together with leak detection fluid at the joint
Position in the sequenceacceptance test immediately before fillingpreliminary step right after installation

  • Acceptance of a newly installed cooling circuit before the first fill
  • Checks after rebuilding, extension or component replacement
  • Pre-testing individual sections while installation continues
  • Evidence of tightness for the operator and the insurer
  • Repeat testing after re-tightening leaking joints